JS Restoration
Sunday, June 17, 2012
Finished driveway
Interior shot of sliding glass door and driveway
new driveway exposed aggregate
Wednesday, June 13, 2012
Driveway rebar completed.Ready for pore.
French drain system by NDS
French drasin system and driveway gutter system by NDS
Driway demoed and removed. Install rebar grid reinforcing the 4000 psi concrete (exposed aggregate finish)
New down spouts. Installed on a 2/12 pitched roof
Installation of new downspout boots for increased size of down spout. This allows more water flo.
Friday, June 8, 2012
Repaired drywall after new framing was installed. New slider view from inside
Newer Posts
Older Posts
Home
Subscribe to:
Posts (Atom)